ProGen were commissioned to provide full LV/HV design and build of electrical services to a 2MWe gas-fired CHP plant at one of the largest new-build district heating schemes in the UK, at Cranbrook Energy Centre.

The single gas 11KV chp engine electrical system were bespoke built, with the CHP containerized and dropped into postion.

The services ProGen provided on the project were to E-ON’s technical specifications and tight deadlines, it included:

  • HV/LV cable system design and calculations
  • HV/LV design and build heavy duty cable containment systems
  • 24V/110V control cabling
  • 230V/415V LV power cabling
  • 11KV HV power cabling
  • 230V/415V LV cable glanding and terminations
  • 11KV HV cable glanding and terminations
  • LV testing and commissioning
  • 11KW HV testing and commissioning

The project was completed within six weeks with all LV/HV services provided in house for full management control and successful project delivery.

We are proud to have worked on a vast variety of exciting projects across a range of sectors, a selection of our completions include:

Entrade

Backup CHP Bespoke Indoor Food Production

E-ON

2MW CHP District Heating -Cranbrook Energy Centre

GAM

6MW STOR CHP Prestige House

Welsh Power

16MW CHP Indoor Bespoke Build

At ProGen we are proud of our hard-earned reputation for quality, customer service and compliance.

If your needs cannot be met with one of the our standard services, we would love the opportunity to work closely with you to achieve your specific requirements, singularly or working alongside other specialist providers if required. Get in touch with one of our specialists to see how we can help your business:

Contact Us